试论基本建设项目土建施工合同中的价格调整 被引量:1

Price Adjustment of Civil Engineering Contract for a Capital Construction Project
下载PDF
导出
摘要 文章首先讨论了价格调整的必要性,继而对文件证据法的利弊做出了评价,基于国内外研究成果对公式法及其应用问题进行了重点探讨。建议设立非调整因子、采用价格调整的上限和下限、在项目的不同阶段分别运用子公式,对统计价格指数在应用中的一些普遍性问题提出了合适的解决方法。 In this paper, the necessity of adjusting contract price of civil engineering project was discussed; the advantages and disadvantages of the document-proof measure were analyzed and evaluated; then based on the existing achievements of both domestic and foreign researchers, the theory of the formula measure of price adjustment and its application were studied intensively. It was suggested that a non-adjusting factor should be introduced, the upper limit and the lower one should be adopted for price adjustment, and the sub-formulae should be used respectively for different period of the project. Some solutions to the problems existed generally in applying the statistic price index were also advanced.
作者 汪洵波
出处 《云南水力发电》 2005年第4期92-98,共7页 Yunnan Water Power
关键词 价格调整 文件证据法 公式法 统计价格指数 price adjustment measure of documentary proof, measure of adjustment formula statistic price index
  • 相关文献

参考文献11

  • 1鲁布革工程管理局.鲁布革水电站建设项目管理的实践[J].水力发电,1994,(8). 被引量:1
  • 2鲁布革工程管理局.世界银行·项目采购补充指南[S].,1984(11).. 被引量:1
  • 3陈开朗.我们是怎样处理合同价格低于实际成本的[J].水电建设管理通讯,(11). 被引量:1
  • 4鲁布革工程管理局.鲁布革水电站·基本建设竣工统计报告[R].,1994.. 被引量:1
  • 5二滩水电工程公司.二滩水电站·地下厂房工程标·第87次进度款支付签证[R].,1999年5月17日.P1. 被引量:1
  • 6鲁克瀛.加拿大安大略电力公司水电工程造价管理考察简介[J].水电建设管理通讯,(35). 被引量:1
  • 7水利部 国家电力公司 国家工商行政管理局.价格调整.水利水电工程施工合同和招标文件示范文本[S].,2000.. 被引量:1
  • 8.水利水电工程造价价差调整办法[R].能源水规(1989)第1151号附件三[R].,.. 被引量:1
  • 9华罗庚著..高等数学引论 第一卷 第二分册[M],1979:337.
  • 10Zadeh, L. A., "Outline of a New Approach to the Analysis of Complex Systems and Decision Processes, "Systems, Manand Cybernetics, Institute of Electrical and Electronics Engineers, Vol. SMC - 3, No. 1,1978, pp.28 - 44. 被引量:1