摘要
根据贵州乌江渡水电站1983年~1991年9年多的实际运行情况及调研成果,并分析乌江渡水库目前实际运行方式以及乌江渡水电站在电力系统中的作用,对比乌江渡水电站的水能设计成果,从能量指标复核、正常蓄水位、汛期防限水位、装机容量等各方面进行总结,分析表明该电站的水能设计基本上是合理的,还分析了一些实际运行与原设计存在差距的原因。
Based on the actual operations of Wujiangduu HydrpoOwerStation from 1983 to 1991, the reservoir present operation and the function of the station in power system were analyzed. Achievements in hydraulic energy design of the station were compared.Energy index,normal pool level, limited flood level, installed capacity, and so on were assessed. It is shown that the hydraulic energy design of the station is basically rational, and the causes of the difference between actual operation and original design were discovered.
出处
《水力发电》
北大核心
1995年第3期48-51,共4页
Water Power
关键词
水电站
运行
水能
装机容量
电力系统
hydraulic energy parameters, installed capacity, normal pool level, power system