深圳前湾燃机电厂一期工程P3项目管理软件应用 被引量:1

Application of P3 project management software in first phase construction of Shenzhen Qianwan gas turbine power station
下载PDF
导出
摘要 进度计划、资源管理和成本控制是工程建设企业关注的问题,P3项目管理软件是目前实现工程进度管理的成熟软件之一。为提高项目管理水平,深圳前湾燃机电厂一期工程运用P3E/C开展项目进度管理。详细介绍编码方案、计划层次划分、计划编制和反馈控制整个项目管理生命周期的具体实施办法,总结该软件在工程项目管理4个方面作用:强化项目管理意识、整体协调工程工期、预见问题科学应对和优化工程进度。并指出软件在费用处理方面应加以完善。 Project schedule, resources management and cost control were the factors that engineering construction enterprise concerned; P3 project management software was one of the mature software which carried out project schedule management currently. For the purpose of improving management ability, P3 E/C was applied in the first phase construction of Shenzhen Qianwan gas turbine power station in project progress management. Implementation of the whole project management lifecycle including coding plan, schedule levels, establishment and control of the schedule was described in detail. Four functions of the software on engineering project management are summarized: enhancing project management consciousness, arranging working period collectively, foreseeing problem and managing scientifically, and optimizing project schedule. Affirmative conclusion is elicited and further improvement in expense management is put forward.
作者 邓乐毅
出处 《中国电力》 CSCD 北大核心 2005年第8期86-89,共4页 Electric Power
关键词 发电厂 项目管理 进度计划 优化 P3项目管理软件 power station project management schedule optimization
  • 相关文献

参考文献2

  • 1美国项目管理协会..项目管理知识体系指南 第3版[M].北京:电子工业出版社,2005:374.
  • 2肖和平.P3E/C参考手册[R].上海:上海普华科技发展有限公司,2003.. 被引量:1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部