摘要
在荫营煤矿四号风井区401风井、411风井工程施工中,坚持施工前认真审查设计图和施工组织设计,施工过程中的严格监控原材料质量和施工质量,施工后严格检查验收,从而保证了立井的施工质量。
In the construction of the air shaft 401 and 411 in the No.4 air shaft area of the Yinying Coalmine, through conscientiously checking of the design drawings and the construction management plan before the construction, the strictly controlling of the raw materials quality and the construction quality in the course of the construction, and the strictly checking and accepting after the construction, the construction quality of the shaft is guaranteed.
出处
《科技情报开发与经济》
2005年第14期279-279,共1页
Sci-Tech Information Development & Economy
关键词
立井施工
质量控制
施工质量
construction of shaft
quality control
construction quality