摘要
对于整体式多路阀,传统的出厂试验方法需占用许多辅助时间,工人劳动强度大,效率低。本文所研制的专用工作装置,被试阀可一次安装到位,进行全部项目的试验,提高工效五倍以上,特别适合工厂出厂试验。
For integrated multipath valve, methods traditional ex-factory the testing used to be time-consuming and laborous. The purpose of this paper is to introduce the specially designed device. Using this device once the tested valve can be installed successfully, it can carry out the whole testing process at the sametime, raising efficiency more than five times. It is especially suitable for the ex-factory test.