摘要
分析了矿山采掘计划编制的数学模型与计算机方法的研究现状和矿山采掘计划编制的技术特点,应用计算机模拟理论建立了矿井采掘接替模型,给出了煤矿采掘衔接计划编制计算机辅助系统的设计方法和实现技术,提高了采掘计划编制的速度。
The development and achievements on the use of mathema ti cal model of mining plans and the present state are reviewed.A under-study mode l is established using computer's analog theory, and an interactive approach to computer aided production scheduling systems is presented. As an application of the approach, the speed of the mining plans is increased.
出处
《山西煤炭》
2005年第2期11-14,共4页
Shanxi Coal
基金
山西省自然科学资金资助项目(20031053)
关键词
矿山
采掘接替模型
模拟
mine
mining under-study model
simulation