摘要
本文根据连续箱梁的实际施工情况,分析了后张法预应力体系的施工过程及所需注意的工序和各种不利情况下的处理方法。
Construction process and disposal methods in difficulties in the construction of post-tensioned pre-stressed system are discussed based on the construction practice of continuous box beam in a flyover of Beijing-Fuzhou Expressway.
出处
《工程质量》
2005年第7期34-37,共4页
Construction Quality