摘要
针对川东北气藏的高温、高压和高含硫特征,从井下测试管柱和地面测试流程的优化设计出发,形成了适合于川东北高压含硫气藏的测试工艺技术体系,并在毛坝1井的中途测试和产能测试中成功应用。
To the features of high temperature, high pressure and containing sulfur of reservoir in north and east of Sichuan gas field, from optimized design of testing string and surface flow operation,a set of testing system suiting for high pressure reservoir containing sulfur in north and east of Sichuan has been formed which has been applied successfully in open hole test and production test in maoba 1 well.
出处
《油气井测试》
2005年第3期40-42,共3页
Well Testing