就某工程基础采用人工挖孔桩施工过程中遇到的几个技术问题进行了介绍。
In the article, some methods in construction manual excavation piles are introduced. The construction techniques were successfully used in complex condition such as ambiguous barriers, silt soils and falling off of wall protection. The construction methods can be used in similar condition of manual excavation piles.
出处
《土工基础》
2005年第3期43-44,共2页
Soil Engineering and Foundation
关键词
人工挖孔桩
施工方法
不明障碍物
淤泥质土
manual excavation pile, construction method, ambiguous barriers, silt soils