长钢涪江铁路大桥七号桥墩病害的整治

Repairing for No.7 Pier under Chang-gang Railway Bridge
下载PDF
导出
摘要 文章介绍对 7号墩采用钻孔桩置换原扩大基础 ,并拆除原有墩身钢板套箍 ,桩顶设置外包承台 ,用锚杆将外包承台与桥墩连成整体 ,应用“墩身置换”方式来整治桥墩病害。 The article deals with the application of “Bridge Pier Replacement” method to correct drawbacks occurred in No.7 pier under Chang-gang Railway Bridge. The substitution of cast-in-place stakes supporting bridge weight for the expanded base of old pier mainly contains the following measures like, to remove steel-plate hoops bound the pier body, then to construct a composite reinforced concrete structure at the head of stakes around the old pier, in the final step, new reinforced concrete structure and old pier are made into a whole body by use of anchor pole.
作者 李林
出处 《特钢技术》 CAS 2004年第3期33-36,共4页 Special Steel Technology
关键词 桥墩 铁路大桥 整治 病害 涪江 扩大基础 钻孔桩 置换 墩身 承台 外包 Gravel, Pier base, Scouring, Cast-in-place stake, Reinforced bar basket, Concrete structure, Replacement.
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部