期刊文献+

柴湾排涝泵站电动机起动电压计算

Calculation of Motor Actuating Voltage in Chaiwan Discharging Waterlog Station
下载PDF
导出
摘要 针对异步电动机起动母线压降计算中存在的问题,结合柴湾站计算实例,分析了高压线路阻抗、变压器阻抗、低压线路阻抗、其它负荷阻抗和起动电机阻抗对母线压降的影响。阐述了正确的计算方法和应注意的问题。 In the design process of electric part of discharging waterlog pumping station of middle and smallscale, which form can be taken to start asynchronous motor is determined through the calculation of bus voltagedrop of low pressure when actuating motor. Aimed at the existed problem in this calculation and with the casecalculation of Chaiwan station, the influence of impedance such as high pressure transformer, low-pressure,other loads and actuation of motor to bus voltage drop is analyzed. The correct calculation method and whatshould pay attention to are stated.
出处 《排灌机械》 2005年第1期28-30,41,共4页 Drainage and Irrigation Machinery
关键词 异步电动机 起动 母线 电压降 计算 Asynchronous motor Actuating Bus voltage drop Calculation
  • 相关文献

参考文献2

  • 1武汉水利电力学院电力工程系编..机电排灌设计手册 下[M],1982:621.
  • 2张勖成.给排水设计手册(第8册)电气与自控[M].北京:中国建筑工业出版社,1986.243-252. 被引量:1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部