摘要
结合具体的工程概况,介绍了锚杆静压桩和墙下基础土层共同工作的方案,阐述了地基基础计算和施工沉降观测,实践证明,该方案可有效控制建筑物沉降,造价相对低廉。
Combined with survey of concrete project,it in tr oduces together working plan of anchor pole static pressure pile & basic soil le vel under wall and illustrates basic calculation of foundation & subsidence obse rvation of construction.It is proven that this method control subsidence of arch itecture effectively with relatively low cost.
出处
《山西建筑》
2005年第10期3-3,16,共2页
Shanxi Architecture
关键词
锚杆静压桩
条形基础
单桩承载力
anchor pole static pressure pile, linear basis, bearing force of single pile