期刊文献+

条带开采煤柱稳定性的试验模拟与数值分析——以山东省济宁市太平煤矿为例 被引量:3

Experimental Simulation and Numerical Analysis of Partial Extraction Pillar Stability——A Case Study of Taiping Coalmine, Jining City, Shandong Province
下载PDF
导出
摘要 以山东省济宁市太平煤矿为例,采用煤柱模拟试验和数值分析手段,对薄基岩条带开采时所留设煤柱的应力应变状态、煤柱强度结构及煤柱长期稳定性进行了深入的分析与研究,揭示了煤柱稳定性及煤柱应力分布与条采尺寸、采出率、覆岩特征的相互关系,进行了条带煤柱的稳定性评价,为工程实践提供了理论依据。 To take the Taiping coalmine in Jining City, Shandong Province as an example, the authors introduced measures of simulating test and numerical analysis, carried out in-depth analysis and research of pillar stress and strain states, strength mechanics and long-term stability of leaved pillars during thin bedrock partial extraction. Revealed interrelation between pillar stability, stress distribution and partial extraction dimension, recovery ratio, overlying strata features. Carried out partial extraction pillar stability assessment, provided theoretical basis for engineering practices.
出处 《中国煤田地质》 2005年第2期29-31,55,共4页 Coal Geology of China
关键词 条带开采 模拟试验 煤柱稳定性 数值分析 太平煤矿 partial extraction simulating test pillar stability numerical analysis Taiping coalmine
  • 相关文献

参考文献6

  • 1赵国旭..大条带综放开采引起的地表移动变形规律及控制研究[D].中国矿业大学,2000:
  • 2孙国庆..条带开采煤柱宽度计算及其稳定性研究[D].中国矿业大学,1992:
  • 3郭增长..极不充分开采地表移动预计方法及建筑物深部压煤开采技术的研究[D].中国矿业大学,2000:
  • 4杨伟峰..薄基岩条带开采覆岩与地表移动变形机理的研究及优化设计[D].中国矿业大学,2003:
  • 5徐海燕,肖洪天.煤层开采过程中底板岩层渗流稳定性分析[J].地质与勘探,2001,37(5):91-93. 被引量:4
  • 6张开智,郭周克,程秀洋,张金元,夏均民.坚硬顶板煤柱稳定性实测分析[J].煤炭科学技术,2002,30(4):12-15. 被引量:5

二级参考文献10

共引文献7

同被引文献25

引证文献3

二级引证文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部