期刊文献+

市场力指标组态作用下的发电企业报价带研究 被引量:1

Study on Bid Strip of Electricity Supplier on the Combinatorial Effects of Market Power Indices
下载PDF
导出
摘要 在电力市场复杂多变的市场环境下, 对于参与报价的发电企业来说, 对自身在市场中所处的竞争地位的估计具有重要的经济意义。发电企业通过全面综合地对市场中各个参与者或者单独对自身各种竞争力指标的估计, 分析得出自己在市场中竞争的地位, 从而进行相应合适的报价。不同市场力指标反映不同的竞争因素。从发电企业的角度, 对HHI, DHHI, MRR, Lerner, MPC 五种市场力指标进行分类分析, 分为报价事前分析和报价事后分析。最后综合多种因素分析得出一个衡量市场力的综合指标, 该指标的大小范围同时也决定了发电企业的报价范围———报价带, 发电企业可以根据报价带进行有优势的报价, 并举例说明对发电企业市场竞争力的分析要充分考虑多方面因素, 综合评估才能得出科学判断。 In the complicated environment of power markets, it has a great financial significance for electric power suppliers who bid in the power markets to accurately evaluate their own positions in the markets. Electric power suppliers should foresee their competitive positions by assessing market power indices of all market participants or only by assessing their own market power indices,; and then design proper bidding strategies accordingly. Different market power index relate to different competition factors. Five indices methods, which are HHI,DHHI,MRR,Lerner,and MPC, are used to analyze the competitive position of an electric power supplier. These indices are divided into two groups: one is a pre-analysis and the other is a post-analysis. By synthesizing various factors, an integrated index has been derived for market power evaluation. The value of this integrated market power index will determine the bid range, so-called the bid strip, for an electric power supplier. Electric power suppliers can then use the integrated power market index to bid rationally. A case study indicates that the analysis of market power for electric power suppliers should take into account many factors in order to make a reasonable judgment by a synthetic evaluation.
出处 《现代电力》 2005年第2期71-76,共6页 Modern Electric Power
基金 国家973计划资助项目(2004CB217905)
关键词 电力市场 发电企业 市场力 市场力指标 报价带 power market electricity supplier market power market power index bid strip
  • 相关文献

参考文献11

二级参考文献56

  • 1张少华.电力市场远期合同的风险建模理论研究:博士学位论文[M].上海:上海大学,2000.. 被引量:1
  • 2[2]美国PJM电力市场(US PJM Electricity Market). http://www.pjm.com/ 被引量:1
  • 3[3]Cheung K W, Shamsollahi Payman, Asteriadis S, et al. Functional Requirements of Energy and Ancillary Service Dispatch for the Interim ISO New England Electricity Market. In: IEEE Engineering Society Winter Meeting. New York (USA): 1999, 1. 269~273 被引量:1
  • 4[4]Schuler R. Electricity and Ancillary Services Markets in New York State: Market Power in Theory and Practice. In: Proceedings of the Hawaii International Conference on System Sciences. Hawaii (USA): 2001. 56 被引量:1
  • 5[5]Alvey T, Goodwin D, Ma Xingwang, et al. Security-constrained Bid-clearing System for the New Zealand Wholesale Electricity Market. IEEE Trans on Power Systems, 1998, 13(2): 340~346 被引量:1
  • 6[8]Cheung K W, Shamsollahi P, Sun D, et al. Energy and Ancillary Service Dispatch for the Interim ISO New England Electricity Market. IEEE Trans on Power Systems, 2000, 15(3): 968~974 被引量:1
  • 7[9]Tolley D. Market Mechanisms for Power Reserve Services. In: IEE Colloquium (Digest). London (UK): 1998(190). 8/1~8/7 被引量:1
  • 8[10]Ford R. Ancillary Services in England and Wales. In: IEE Colloquium (Digest). London (UK): 1996(164). 5 被引量:1
  • 9[11]Wood G F, Hung W W. Generating Plant Frequency Control Services. In: IEE Colloquium (Digest). London (UK): 1995(028). 1/1~1/5 被引量:1
  • 10[12]Carlton Jon. Current Mechanisms for Procurement and Payment of Power Reserve Services. In: IEE Colloquium (Digest). London (UK): 1998(190). 6/1~6/5 被引量:1

共引文献170

同被引文献12

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部