期刊文献+

南水北调东线一期穿黄河工程安全监测设计

Safety Monitoring Design for the First Stage Across Yellow River Project on East Line ofSouth-to-North Water Transfer Project
下载PDF
导出
摘要 介绍了南水北调东线一期穿黄河工程各建筑物的安全监测项目及监测布置情况,以黄河隧洞和黄河险工大堤作为重点监测对象,监测工程施工期及运行期的安全;并介绍了监测站及监测系统的设计方案。 In this paper introduced are the safety monitoring items and monitoring arrangement for the structures of the first stage across the Yellow River project on the east line of the South-to-North Water Transfer Project. The tunnel across the Yellow River and the Yellow River levee are two objects which will be given emphasis to in monitoring so that the project safety can be guaranteed during construction and operation. The design plan of monitoring station and monitoring system is presented.
出处 《水电自动化与大坝监测》 2005年第1期49-51,共3页 HYDROPOWER AUTOMATION AND DAM MONITORING
关键词 穿黄河工程 监测 应力 across the Yellow River project safety monitoring stress
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部