摘要
综合钦州湾龙门站与近海区钓鱼台站长年历史观测资料和2003年7月的6个站点全潮观测资料,阐述了钦州湾的表层沉积物分布和钦州外湾典型位置沉积物组成状况,并结合钦州电厂建设规划,通过海床稳定性的概念和稳定性指标的计算方法,研究钦州电厂取排水工程附近海域及钦州外湾在潮流和波浪作用下的海床稳定情况,计算结果表明所提出的稳定性理论能够反映实际,是可靠的,可以进一步作为钦州电厂相关模拟研究的基础。
According to the long-term historical data in Longmen and Diaoyutai stations, and the tidal level observation data from six stations in July 2003, this paper sets forth the sediment distribution on the Qinzhou bay seabed surface and its outer bay sediment composition at the typical positions. In the light of the construction plan of the Qinzhou Power Plant, we analyze the seabed stability condition under the joint effect of current and wave. Research findings indicate that the stability theory reflects the true station, and it can be used as basis for further relevant research in the Qinzhou Power Plant.
出处
《海洋通报》
CAS
CSCD
北大核心
2005年第2期26-32,共7页
Marine Science Bulletin
基金
自然科学基金项目(编号:40376028
50279030)资助
关键词
水动力
泥沙
海床稳定性
钦州湾
hydrodynamic forc e
sediment
seabed stabilit y
Qinzhou Bay