期刊文献+

沙角A电厂国产200MW发电机3/变压器组的增容改造 被引量:1

Capacity-increasing transformation of 200 MW Chinese-made generator- transformer units in Shajiao A Power Plant
下载PDF
导出
摘要 为适应国产三缸三排汽200 MW汽轮发电机组全面技术改造的需要, 广东省沙角A电厂分别于2000年和2002年对一期3台200 MW机组中的2号和3号汽轮机进行了三缸通流改造, 同时对原发电机变压器组也进行了改造, 使机组增容至220 MW。为此, 对其发电机变压器组增容的情况进行了评估分析, 并对相关设备进行了改造。实际运行表明: 改造后发电机变压器组各项指标均在运行规程规定范围内。 To meet the needs of overall technical reconstruction on Chinese-made 200 MW three-cylinder triple-flow turbo units,Unit 2 and Unit 3 steam turbines in the first phase project of Shajiao A Power Plant underwent three-cylinder throughflow transformation in 2000 and 2002 respectively.The generator-transformer units were also reconstructed so as to raise the capacity of the units to 220 MW.Evaluation analysis was made in this regard and relevant equipments transformed.Operation results show that all indices of the transformed generator-transformer units satisfy the corresponding operation code.
作者 林史峰
机构地区 沙角A电厂
出处 《广东电力》 2005年第3期46-49,70,共5页 Guangdong Electric Power
关键词 发电机-变压器组 200MW机组 增容改造 generator-transformer unit 200 MW unit capacity-increasing transformation
  • 相关文献

同被引文献15

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部