摘要
对110 kVSF6断路器控制回路存在问题进行了分析,采取完善化改造措施后效果良好。
Existed the problem to carry on the analysis to the 110 kVSF6 chopper control back track, adopt perfect turn to reform the measure behind the result is good.
出处
《西北电力技术》
2005年第1期50-51,共2页
Northwest China Electric Power