期刊文献+

高层建筑物整体移位技术的探讨 被引量:6

On integral translation technique of high-rise buildings
下载PDF
导出
摘要 以广西梧州市人事局综合楼平移工程的设计和施工为例, 论述了高层建筑平移技术的原理,介绍了平移的设计及施工方式, 并对高层建筑物平移的设计和施工中的技术可行性和安全性进行了讨论。广西梧州市人事局综合楼建筑面积 8 836m2, 楼重 13 254t, 楼高为 36 8m, 10层框架结构, 平移距离 30 276m, 并且已于 2004年 5月 25日平移就位。 A ten-story building in the city of Wuzhou, Guangxi Zhuang Autonomous Region has been integrally translated to a new site 30.276 meters away. The weight of the building is 13 254 t and hight 36.8 m. The project was completed on 24 May, 2004. The paper takes this project as an example, and explains the principle of integral translation technique of high-rise buildings and introduces its design and implement approaches. The technical feasibility and safety of the design and implement are also discussed in the paper.
出处 《大连水产学院学报》 CSCD 北大核心 2005年第1期57-60,共4页 Journal of Dalian Fisheries University
关键词 高层建筑 整体平移 轨道 high-rise building integral translation track
  • 相关文献

参考文献5

二级参考文献25

共引文献29

同被引文献22

引证文献6

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部