摘要
本文是作者最近赴俄罗斯访问的关于水工结构抗震的考察报告。文中介绍了首次编制的俄罗斯水工结构抗震设计规范的进展情况,较详细介绍了建于高烈度区的目前世界最高的英古里拱坝(坝高271米)的抗震设计要点。最后,简述了俄罗斯水工结构抗震科研的现状。
This paper is based on a recent visit to Russia to exchange information of aseismic study on hydraulic structures between two countries. The development of the first 'Aseismic Design Code of Hydraulic Structures in Russia' is briefly introduced. The main points of the a-seismic design of the highest Inguri arch dam (H=271 m) located in region with high seis-micity are described in detail. Finally, the state-of-the-art in research on earthquake resistance of hydraulic structures in Russia are presented.
出处
《世界地震工程》
CSCD
1994年第3期1-9,共9页
World Earthquake Engineering