期刊文献+

复合型坚硬顶板在初压期间的再断裂及其控制 被引量:1

RE-FRACTURE OF COMPLEX STRONG ROOF AND ITS CONTROL IN INITIAL WEIGHTING PERIOD
下载PDF
导出
摘要 讨论了三河尖煤矿复合型坚硬顶板的剥离冒落特点、顶板剥离体在运动过程中的内力分布、顶板再断裂位置的控制等问题。据此,认为该类顶板控制的关键是把剥离体的再断裂控制于切顶线之外,这样可以大大减少工作面所受压力。给出了这种顶板条件下合理切顶力的确定方法。 in this paper the characteristics of complex strong roof are discussed in roof separation and caving process in San Hejian Colliery. Distribution of internal forces in the movement of separation body and control of position of roof re-fracturing are analyzed. Based on this the authors drew a conclusion that the key to control of this kind of roof is to keep re-break position of the caving rock beam outside the cutting-off line so that roof pressure in the work face can be reduced enormously.A method for determining the cutting-off resistance is presented.
机构地区 中国矿业大学
出处 《煤炭学报》 EI CAS CSCD 北大核心 1994年第4期352-359,共8页 Journal of China Coal Society
关键词 顶板管理 矿山压力 再断裂 切顶力 complex strong roof, separation body, super-long cantilever beam,roof re-breaking, cutting off resistance
  • 相关文献

同被引文献7

引证文献1

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部