期刊文献+

人工壁柱房柱法采场地压的发展及控制 被引量:6

The Ground Pressure Development and Control of the Room-and -PillarMining Stope with Man-Made Wall Pillars
下载PDF
导出
摘要 本文综合分析了锡矿山北矿童家院矿床岩石移动、岩体声发射和光应力计观测结果,通过和以往南矿大面积地压发生和发展过程中地压监测结果的对比分析,指出童家院矿床三中段127~193采场目前处在大面积地压预兆期,并提出应采取的地压控制措施。 Abstract The paper analyses comprehensively the observation results of the rock displacemeter gauge,rock body' sound emission meter and optical stress gauge for Tongjiaguan deposit of the North Mine in Xikuangshan. Through the comparative analysis with the inspection results during the occurrence and development of the large-area ground pressure in the South Mine,the paper points out that the 127~193 stope of the third middle section in Tongjiaguan deposit is now in the signs period of the large-area ground pressure and makes the suggestions on the measures that should be taken to control the ground pressure.
作者 祝禄发
机构地区 锡矿山矿务局
出处 《金属矿山》 CAS 北大核心 1994年第12期26-29,35,共5页 Metal Mine
  • 相关文献

同被引文献25

引证文献6

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部