摘要 本文通过对几个典型电网弃水调峰情况的调查分析 ,指出了弃水调峰的原因。并以华中电网为例 ,分析了近几年电网负荷率、最大峰谷差、火电综合调峰能力及弃水调峰损失电量的变化趋势。文中对如何合理确定水电厂的弃水电量进行了详细的探讨 ,并从电源结构、运行管理、经济政策、电网调度等方面对减少水电弃水调峰损失的措施进行了初步的探讨。 This paper deals with the cause of water discharge loss of a hydropower station for the peak&valley balance during the flood season based on the operation investigation and analysis of different power grid. A preliminary scheme to reduce the water discharge loss of the hydropower station during the day's valley period in the flood season is established based on the power resource structure, administration, energy policy, dispatching and operation of the power system.
出处 《水力发电学报》 EI CSCD 北大核心 2003年第4期1-7,共7页 Journal of Hydroelectric Engineering
关键词 水电 调峰 综述 弃水 措施 hydropower peak&valley balance summation discharge loss measures
  • 相关文献

参考文献3

二级参考文献2

共引文献19

同被引文献210

引证文献25

二级引证文献173

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部