摘要
从设计变更、现场签证、技术措施、材料代用、合同外追加部分几个方面详细阐述了工程变更价款审查的重点内容和方法。
The text expounds the important contents and ways of the investigation to the additional project cost, which includes, modification of the design, on-site visa, technical measure, material reqlace ment and exceed project of the contract.
出处
《河北工程技术高等专科学校学报》
2004年第4期39-40,45,共3页
Journal of Hebei Engineering and Technical College Quarterly
关键词
工程变更
价款
审查
project modification
cost
investigation