摘要
对珠钢220kV总降压变电站1#33kV配电系统在运行中暴露出来的主要问题进行了分析,改进了该总降33kV系统,确保了供电系统安全、可靠运行。
The main problems in running of the 33 kV distribution system of No.1 electric furnace in the 220 kV step-down substation of Zhujiang Iron & Steel Co. Ltd. were analyzed and the 33kV system was improved, which guaranteed safety and reliable running of the power supple system.
出处
《冶金动力》
2005年第1期15-16,25,共3页
Metallurgical Power
关键词
配电系统
SVC
国产化
distribution system
SVC
home-made