摘要
在泥浆护壁钻孔灌注桩施工中,应明确主要的施工技术措施,严格各工序的质量控制,以确保灌注桩的成型质量。
In order to ensure the quality of the piles, in the construction of concrete piling on the drilled holes in the mud protected rampart, it is important to be clear about the main constructing technique measures, and to be serious about the main constructing technique measures, and to be serious about the quality control in each procedure.
出处
《丹东纺专学报》
2000年第2期24-25,共2页
Journal of Dandong Textile College
关键词
泥浆护壁
钻孔
灌注桩
质量控制
concrete piling, technique measures, quality control