摘要
介绍了南京地铁的试桩工程概况。该工程的静载试验采用了自平衡法 ,成功解决了工程难题。试验结果表明 ,该法可适用于多种条件 ,为设计单位提供了设计依据 。
In this article,authors introduce some basic situations of test pile operation conditions of Nanjing Metro.In static loading tests of this project,engineers adopted the self-balance method and solved construction problems successfully.Test results proved that this method is proper for many conditions,can provide design supports for designers and has advantages in pile foundation tests.
出处
《施工技术》
CAS
北大核心
2005年第1期48-50,共3页
Construction Technology
关键词
地铁
桩基
自平衡法
metro
pile foundation
self-balance method