文章针对黄~桥系统供电现状 ,提出了从硝湾变到桥头六期建一条 330kV线路的方案 ,并进行了潮流计算和安全稳定及网损分析 ,以此说明建设这条线路的必要性和可行性。
The paper puts forth a scheme that builds a 330kV circuit from Xiaowan substation to the sixth Phase of Qiaotou Thermal Power Plantin order to improve the circuit's feasibility and necessity,and the paper also calculates tide, analyses stability and network loss.
出处
《青海电力》
2001年第2期7-14,共8页
Qinghai Electric Power