摘要
太平驿水电站工程设计人员在技施设计阶段和现场施工配合过程中,经过大量的试验、分析、计算并学习其它工程的先进经验和先进技术,在建设、监理和施工单位的支持下,对工程的地下结构,闸基防渗等设计进行了不断优化。
Desing optimization of the underground structures and seepage control measures in the sluice foundation has been achieved by the designers of Taipingyi hydropower station during the technical design phase and the project implementation phase on the basis of intensive testing, analysis and calculation with absorbing good practice of the other construction organizations and the support of construction, supervisory organizations of Taipingyi project.
出处
《水力发电》
北大核心
1993年第9期9-12,共4页
Water Power
关键词
水电站
太平驿
设计
最佳化
Taipingyi hydropower station, design optimization, underground power house, headworks, headrace tunnel