三峡二期工程大坝混凝土塔带机入仓快速施工技术 被引量:4

Rapid construction technique for dam concrete placing with towerbelts at the second stage of the Three-Gorges Project
下载PDF
导出
摘要 在简要介绍三峡二期工程大坝概况和大坝混凝土施工拌和制冷系统及浇筑设备布置的基础上,详细阐述了为适应塔带机快速高强度施工,在施工技术工艺和组织管理方面的创新,包括混凝土配合比改进、层间结合工艺改良、计算机综合监控系统研制、坝体上升形象控制、骨料分离预防、混凝土温度控制等.三峡二期大坝混凝土施工的实践证明,采用塔带机入仓快速施工是成功的,可为今后大中型水电工程大坝混凝土快速高强度施工提供借鉴. Based on a brief introduction of the general situation of the dam construction at the second stage of the Three-Gorges Project, the mixing and cooling system for concrete construction, and the layout of casting facilities, some innovations in techniques, organization, and management of concrete construction, suitable for rapid and high-strength concrete construction with towerbelts in the project, were expounded in detail, including the improvement of mixing ratio of concrete, the melioration of interlayer connection technique, the development of computer-based comprehensive monitoring system, the form control with the increase of the dam height, the prevention of the separation of aggregates, and the control of concrete temperature. The practice of dam concrete construction in the Three-Gorges Project shows that the rapid concrete placing with towerbelts is successful, providing a reference for rapid and high-strength concrete construction in large and medium-sized hydropower projects.
作者 周厚贵 曾明
出处 《水利水电科技进展》 CSCD 2004年第6期24-26,共3页 Advances in Science and Technology of Water Resources
关键词 塔带机 快速施工 大坝混凝土 三峡工程 towerbelt rapid construction dam concrete Three-Gorges Project
  • 相关文献

参考文献1

共引文献3

同被引文献18

引证文献4

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部