期刊文献+

软岩巷道底臌及切缝 被引量:5

FLOOR HEAVE AND SLOTTING THE SURROUNDING SOFT ROCK OF ROADWAY LYING IN SOFT ROCK
下载PDF
导出
摘要 在分析巷道底臌原因的基础上,借助有限元研究,采用切缝防治巷道底臌。结果表明,合适的切缝部位及几何尺寸对巷道底臌有一定的控制作用。 On the basis of analysing the reasons of floorheave of roadway in soft rock. the slotting effecton the prevention of swelling is investigated bymeans of Finite Element Method. It is pointed outthat the deformation due to volumetric expansion,bending and swelling,and also the elasto-plasticaland rheological deformation of the soft rock arethe main causes resulting in the floor heave. Atthe sarne time, the controlling effectiveness of var-ious slotting position and dimension are analysedthrough numerical calculation. It is shown thatslots of proper dimension is effective to some ex-tent on controlling the floor heave of roadway.The reasonable dimension and slotting time dependon the particular situation of the deformation ofthe roadway.
作者 杨永杰
机构地区 山东矿业学院
出处 《矿山压力与顶板管理》 1993年第1期9-13,80,共5页 Ground Pressure and Strata Control
  • 相关文献

参考文献1

  • 1(德)奥顿哥特(Oldengott,M.)著,王茂松译..巷道底臌的防治[M].北京:煤炭工业出版社,1985:115.

同被引文献51

引证文献5

二级引证文献75

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部