摘要
油田开发后期 ,控制含水上升 ,挖掘剩余油的潜力成为老区稳产的基础 ,而常规措施周期短 ,达不到预期的效果。本文介绍了 4″套管补贴工艺技术在部 1井的应用 ,为解决常规措施选井难度大以及老区剩余油的挖潜提供了一条行之有效的方法。
In later-period Oilfield development,controlling high water cut and excavating power of residual oil have become stabile output,s basis in maturing Oilfield,but conventional measure period was short,it cannot reach result that we expected.This paper will review applicantion of 4 inches casing subsidy process technology in Well Bu No.1,it will have some effective methods for resolving problem ,like conventional measure in selecting of wells and taping the latent power of residual oil in maturing Oilfield.
出处
《内蒙古石油化工》
CAS
2004年第4期112-114,共3页
Inner Mongolia Petrochemical Industry