摘要
本文通过对国家工程量清单与我市现行工程量清单所使用的两种不同计价模式的对比,指出推行国家工程量清单计价模式的必要性。
By contrasting the two different valuating systems upon each the detailed list of project amount of our state and that of our city are operated accordingly, this paper points out the necessity of pursuing the valuating system of our state for construction project amount detailed list.
出处
《福建建筑》
2004年第3期85-86,67,共3页
Fujian Architecture & Construction
关键词
工程量清单
明细清单
计价模式
detailed list of project amount
subsidiary list
valuating system