黄河黑山峡河段二级开发方案枢纽布置设计

Project Layout Design of Two-stage Development for Heishanxia Reach of Yellow River
下载PDF
导出
摘要 黑山峡河段2个开发方式的勘测设计工作进行了50多年,二级开发小观音枢纽布置设计以混凝土双曲拱坝为推荐方案,二级开发大柳树低坝枢纽布置设计以混凝土重力坝坝后厂房为推荐方案。 The investigation design work for two kinds of hydro development on the Heishanxia reach has been carried out for more than 50 years. It is recommended that the double curvature concrete arch dam is designed for two-stage development of Xiaoguanyin hydropower project and is also recommended that the concrete gravity dam behind the powerhouse is designed for two-stage development of Daliushu project with a lower dam.
出处 《西北水电》 2004年第3期62-69,共8页 Northwest Hydropower
关键词 黑山峡 小观音 大柳树 枢纽布置 高边坡 松动岩体 Heishanxia Xiaoguanyin Daliushu project layout high slope loose rock mass