摘要
某工程基础人工挖孔桩施工中遇流沙难以进行 。
The construction of the holing pile of artificial control of the project basement of an university is hard to go on because of shifting sand. After study and calculation, we adopt the platform bearing pile made of steel tube.
出处
《现代机械》
2004年第5期83-83,19,共2页
Modern Machinery
关键词
承台
钢管
人工挖孔桩
流沙
工程基础
施工
计算
The platform bearing pile of steel tube
Base
building and drifting
sands