摘要
本文利用目前较新的方法对吉林台电站坝区地震活动性进行了多方面的探讨。资料分析与处理‘包括绘图均在计算机上进行。
In this paper, a new and current method was used to analyse and study the seismicity on the dam area in Jilintai hydropower station in several parts. All the materials were analysed and handed with the computer, including drawing maps.
出处
《内陆地震》
1989年第1期34-41,共8页
Inland Earthquake
关键词
地震活动性
强震
分布
吉林
地震台
Site seismicity Strong earthquake distribution Intensity Frequency Computer Jilintai