套管补贴水泥加固修井技术及其在史6-11井上的应用 被引量:6

The Well Workover Technology of Cement Casing Patch Reinforcement and Application in Well Shi 6-11
下载PDF
导出
摘要 目前大部分油田已进入开发后期 ,油水井井下套管损坏严重成为制约老油田进一步提高采收率的主要因素之一。套管补贴水泥加固修井技术是针对油水井套管破裂、变形、错断等损坏情况 ,使用管柱将完好套管传输下入套损段 ,配合水泥封堵固井技术 ,将完好套管补贴加固在原套损段上 ,实现老井套管再造的修井工艺技术。该技术原理简单 ,施工方便 ,在胜利油区史南油田史 6- 1 1井上成功应用后 ,为修复套管损坏井正常生产 。 At present, as most developed oil fields entered anaphase, down-hole casings of oil and water well are seriously damaged, and become a limitation factor to improve recovery efficiency of developed oil fields. Aiming at damaged casing, such as casing deformation, failure and dislocation, in order to mend the damaged casing, the well work-over technology of cement casing patch reinforcement transports good casing to the damaged casing place by pipe column and patch the good casing on it by working with the cement plugging technology. The principle of this well work-over technology is simple, and operated easily. It offers precious experience to mend wells with damaged casing and improve the level of reservoir development after successful application in well Shi 6-11 of Shinan oil field in Shengli.
出处 《海洋石油》 CAS 2004年第3期86-89,共4页 Offshore Oil
关键词 套管损坏 套管补贴 修井技术 原理 施工工艺 Damaged casing casing patch well workover technology technology principle operating means
  • 相关文献

参考文献3

二级参考文献4

共引文献76

同被引文献11

引证文献6

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部