摘要
本文对炼油厂含油污水处理厂增设二级浮选的点位设在曝气池之后并采用JHX多级射流浮选罐可行性进行了论证和分析。
We use JHX multilevel jet floatation pot as secondary floatation point after aeration pond in oil containing sewage farm of refinery. This paper discusses the feasibility of this method.
出处
《黑龙江环境通报》
2002年第4期25-27,共3页
Heilongjiang Environmental Journal