摘要
本文动态地考察了项目选择的多阶段过程,根据项目选择的多目标性多约束性以及资源约束的模糊性建立了多目标项目选择模糊约束0—1动态规划模型。文中详细讨论了所建立模型的算法,给出了计算流程框图。最后,本文讨论了模型的特点和尚待进一步解决的问题。
This paper dynamically addresses the multi—stage process of projects selection. Based on the properties of multi—objective multi—constraint of projects selection and fuzzy limits of resources we build up a multi-objective projects selection 0—1 dynamic programming model under fuzzy constraints The paper fully describes the algorithm of established model and gives the flow chart of calculation. Finally the paper discusses the characteristics of given model and the problems left for further study.
出处
《管理工程学报》
CSSCI
1993年第4期236-241,共6页
Journal of Industrial Engineering and Engineering Management
关键词
多目标
项目选择
动态规划
算法
Multi—objective, Projects Selection, 0—1 Dynamic Programming Model, Fuzzy Constraints