摘要
通过对国道 3 10线郑州西岗至上街西段改建工程的施工实践 ,介绍了乳化沥青下封层的施工工序、质量控制及应用效果 ,对提高沥青路面的质量和使用寿命有重要意义。
By the construction practice of reconstruction between Zhengzhou West Mound and Up-street West Part on G310,it introduces the working procedure of emulsified asphalt under-sealed layer,its quality control and its effects of application,which has an important significance on improving the quality and living period of asphalt road surface.
出处
《山西建筑》
2004年第17期106-107,共2页
Shanxi Architecture
关键词
乳化沥青
下封层
沥青路面
施工工艺
质量控制
under-sealed layer,emulsified asphalt,technology of construction,quality control