摘要
润扬大桥南汊悬索桥施工中,利用紧缆机进行主缆紧缆作业。主要介绍该主缆紧缆机的主要性能参数和紧缆施工工艺。
During construction of the Suspension Bridge (south bridge) of Runyang Bridge, the main cables of the Bridge are compacted by compacting machines. In this paper, the performance parameters and compacting construction technology of the machines are mainly described.
出处
《桥梁建设》
EI
CSCD
北大核心
2004年第4期44-46,共3页
Bridge Construction
关键词
悬索桥
缆索
施工机具
紧缆机、施工工艺
suspension bridge
cable
construction machinery
compacting machine
construction technology