摘要
介绍一座 110kV模拟变电站 ,它采用低电压模拟高电压 ,低压设备模拟实际变电站中的一次设备 ,电抗器和电阻模拟实际的线路及负载 ,二次设备采用实际运行中的设备。试验及运行表明 ,该变电站投资少、功能全 ,可真实模拟实际变电站的运行情况 ,进行各种操作及相关试验 ,大大缩短了人员培训的时间 ,提高了培训效果 ,为运行人员的培训、教学及科研提供了实践的场所。
This paper Introduces a 110 kV simulation substation, low voltage is used to imitate high voltage, low voltage equipment are used to imitate primary devices of real substation, reactance and resister are used to imitate real wires, secondary devices use the actual equipment. It has the feature of low investment and more function. Simulation substation can imitate the real; operating situation of real substation, make many operation and relative test, train time can be shorten, effect can be increased. This simulation substation provide a site for train, study and research for operating people.
出处
《高电压技术》
EI
CAS
CSCD
北大核心
2004年第7期24-25,共2页
High Voltage Engineering
关键词
模拟变电站
设计
结构
功能
simulation substation design structure function