摘要
针对平顶山市污水处理厂近两年污水水质特点 ,及对一期工程运行工况的分析 。
From the sewage water quality and character between 2001 and 2003, we studied and analysed the running of the first phase Pingdingshan Sewage Treatment Project. So we can make the second phase project contruction and technological process choice and feasibility of Pingdingshan Sewage Treatment Project.
出处
《平顶山工学院学报》
2004年第2期27-30,共4页
Journal of Pingdingshan Institute of Technology