摘要
阳茂高速公路全线存在大量的高液限土,高液限土具有天然含水量大、亲水性和持水性强、透水性差等特性,晾晒有困难且不易粉碎,施工难度大,对工程的质量及经济效益有比较大的影响。为了确保工程质量,降低工程造价,必须采取适宜的施工方案。
There is a lot of high liquid limit soil in Yangmao Expressway. The high liquid limit soil would influence the engineering quality and economy benefit very much. Because it has high water content, and it is strongly closing and having but poorly pervious water. It is hard to dry by sunshine and difficult to smash and construct. So, to ensure the engineering quality and reduce the construction cost, we should adopt a right engineering project.
出处
《广东交通职业技术学院学报》
2004年第2期19-20,45,共3页
Journal of Guangdong Communication Polytechnic