摘要
对4号矿带进行矿山生产地质探矿和回采工作,是从1997年721-14矿井技术改造工程开始的,随着721-15采铀工程井下巷道的开拓、探矿等工程的实施,目前从平面看,已经从13线工作至61线,从标高看,已经从-50 m工作至-250 m。作为矿山的开采者,如何合理运用探矿方法,提高生产探矿效率,最大限度的回收资源,是目前需要解决的问题。从实践中不断摸索,验证,得出了一套自己的工作经验和工作方法。4号带矿体生产探矿,总结起来就是"平面要完全揭露、竖向要找准重点、多种勘探方式相结合、找准赋存规律";其产状变化依然有规律可循,从局部看看,4号带矿体走向变化主要有北东、北西、南北三组,看似杂乱无章,但从总体上看,它的变化有着密集性。
The geological exploration and mining work of No. 4 ore zone was started in 1997 with the Start of 721-14 mine technological transformation project。with the implementation of 721-15 uranium mining underground roadway development engineering and exploration engineering,at present the work area is between 13 lineand 61 line on the plane and the elevationbetween- 50 metersand- 250 meters. As theminers of the,what we need to do is to make rational use of exploration methods,improve the efficiency of recycling resources,maximum the production. The author explored a set of their own work experience and working method by continual exploration and verification。In general,the No. 4 ore body mining,summed up as ' fully disclosed on the plane,find out the key point in vertical,combine variety exploration method,identify the occurrence regularity'; its occurrence changement still has rules to follow,locally,the strike of No. 4 orebody is northesst east,northwest and northsouth,appeared to be complex,but on the whole,the variation isintensive.
出处
《东华理工大学学报(自然科学版)》
CAS
2013年第S2期9-12,共4页
Journal of East China University of Technology(Natural Science)
关键词
邹家山4号带
产状多变
生产探矿
验证及分析
Zoujiashan No.4 ore belt
changeable occurrences
mining
verification and analysis