摘要
在移位工程中,首先需要采用托换结构改变原结构的传力途径,然后通过液压控制系统实现建(构)筑物的移位。托换结构节点中经常采用的形式有抱柱梁、牛腿、夹墙梁形式,本文介绍上述三种形式的实际使用形式、受力机理、相关研究成果、设计建议,对移位工程的设计具有借鉴作用。
In the shift project,the force transmission route of original structure must be changed by underpin structure firstly,then the location of original structure shifted by hydraulic control system.Underpinning beam,corbel,jacketed wall beam are always used in the design of underpin structure joint.This paper introduces using formal, stress mechanism,related research results,design suggestions of the three above forms.Thus,it can be referenced for the shift engineering.
出处
《建筑结构》
CSCD
北大核心
2013年第S2期711-713,共3页
Building Structure
关键词
托换结构
抱柱梁
牛腿
夹墙梁
underpin structure
underpinning beam
corbel
jacketed wall beam