期刊文献+

Hydropower resources development in the upper Yangtze

Hydropower resources development in the upper Yangtze
下载PDF
导出
摘要 The exploitable potential of hydropower resources in the1,800,000 km^2 Yangtze basin is 197 GW,corresponding to anannual electricity generation of 1030 TWh,while the upper Yangtzeupstream of the city Yichang with drainage area of 1,000,000 km^2possesses an exploitable potential of hydropower resources of 170GW or 85% of what is in the whole Yangtze basin,as river channelsof the mainstem and tributaries in uppe Yangtze pass through highmountains,plateaus and hills.
出处 《Electricity》 1991年第1期20-23,共4页 电气(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部