郑州至西安铁路客运专线为时速350千米的无砟轨道铁路,其路基竣工后不允许发生15mm以上的沉降,为满足该要求,开展了相关试验研究,确定了湿陷性黄土地基处理原则,采用水泥土挤密桩、长短桩及埋入式连续桩板结构成功地对地基进行了处理,取得的成果对即将修建的西宝客专、宝兰客专、西成客专及大西客专具有借鉴意义。
Zhengzhou-Xi'an passenger dedicated railway line is 350 kilometers per hour ballastless track;its allowable subgrade settlement should be less than 15 mm after completion of the subgrade.In order to meet the requirements,the relevant tests are carried out;and the collapsible loess subgrade treatment principles are determined.And the subgrade are treated successfully by using cement-soil compacted piles,long and short piles and embedding continuous pile-board structure.The achievement will be reference to the upcoming construction of Xi'an-Baoji passenger dedicated line,Baoji-Lanzhou passenger dedicated line,Xi'an-Chengdu passenger dedicated line.