期刊文献+

钢梁等强全栓拼接计算之中、日计算方法对比 被引量:1

The Comparison of the Calculated Method of the Bolted Connection with Full-strength of Steel Beams between Chinese Code and Japan Code
原文传递
导出
摘要 钢梁等强全栓拼接因其在工地现场施工方便,比全焊和栓焊连接容易控制施工质量,在日本钢结构建筑中应用比较广泛。结合国内规范和日本规范中关于钢梁全栓拼接的计算方法,对比中日计算方法的不同之处。促进对国内规范相关内容的理解。 Owing to its construction convenience and good construction quality compared to welding connection,the bolted connection of steel beam has been widely used in steel buildings of Japan.In this paper,compared with the calculated method of the bolted connection with full-strength of steel beams between Chinese code and Japan code,good understanding of related content of Chinese code is obtained.
作者 王华
出处 《建筑结构》 CSCD 北大核心 2009年第S1期480-482,共3页 Building Structure
关键词 全栓拼接 弹性阶段设计 塑性阶段设计 bolted connection with full-strength elastic design plastic design
  • 相关文献

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部