考虑到施工顺序和加载条件的不同、施工期间构件材料强度的发展以及混凝土的收缩、徐变时随特性等非荷载效应的影响,实际的结构效应与建立整个结构模型后获得的分析结果将存在相当大的差异。施工过程分析是复杂高层或超高层建筑结构设计的重要内容。本文通过对复杂钢框架核心筒结构进行了施工过程模拟,分析了徐变和收缩等对剪力墙变形、结构竖向差异变形、钢框架柱轴力等因素的影响,可为实际施工提供合理的参考依据。
Considering the construction sequence,loading conditions,and inelastic effects such as shrinkage and creep, there may exist great discrepancies between the actual structural forces and analytical results calculated by the whole structural model.Construction sequence analysis is important for the structural design of tall buildings.Construction analysis of a skybridge connected complex steel frame core-wall tall building is studied in this paper.The influences of shrinkage and cree Pof reinforced concrete core-wall are discussed.Some useful conclusions are obtained and can provide reasonable references for real construction.
出处
《建筑结构》
CSCD
北大核心
2009年第S1期221-224,共4页
Building Structure
关键词
收缩
徐变
非荷载效应
施工过程分析
竖向差异变形
Shrinkage
Creep
Inelastic effect
Construction analysis
Vertical differential deformation